Central Texas Metal Buildings
A metal building with a covered lean-to on dark prairie soil east of Austin, Texas

Lot to occupancy, 46 primary sources read

Which office permits your metal building, and everything that follows from the answer

An Austin-area metal building moves through one sequence: identify the office that has the lot, get the drawings sealed, design the slab, pull the permit, clear the $50,000 accessibility line, settle aquifer and stormwater, bring in water, power and septic, and only then set the steel.

Step one steers every later step. Inside Austin a commercial building goes to the city's plan review; past the city limits Travis, Williamson, Bastrop, Caldwell, Lee and Burnet each answer the permit question differently, anywhere from a county permit with a fire code review to no building permit on the county's site at all.

Inside Austin

Commercial plan review, seven to 20 business days by size

Inside Austin a building permit is required to erect, construct, enlarge, alter, repair, improve, remove, convert, move or demolish any building or structure within the city's zoning jurisdiction, and a commercial building goes through the Development Services Department's commercial plan review under the locally amended 2024 International Building Code, in force since July 10, 2025.

From City of Austin Development Services, 6310 Wilhelmina Delco Drive (read September 20, 2026).

Travis County, outside city limits

County development permit, plus a Fire Marshal permit for a commercial building

Outside city limits, Travis County requires a Development Permit, and its definition of development covers buildings and other structures, driveways, right-of-way work and on-site sewage facilities.

From Travis County TNR Development Services, Commercial Site Plan (read September 20, 2026).

Travis County, home to Austin. The other five counties each have a sheet of their own. The whole record is on that county's sheet.

Is your lot inside a city, in a city's extraterritorial jurisdiction, or in the unincorporated county?

Three locations, three desks. Within a city limit the city permits the building under its own code. In Austin that means a building permit to erect, construct, enlarge or alter any building inside the city's zoning jurisdiction, reviewed under the 2024 International Building Code as the city amends it. The other cities that issue their own permits are named on each county sheet.

The extraterritorial jurisdiction, or ETJ, is unincorporated land where a city has limited say. Austin defines its ETJ as unincorporated land within five miles of the city boundary and outside any other city, where it holds no traditional zoning authority, and it says it issues no new construction permits there, sending applicants to the county instead. Under Local Government Code 212.049, the development plat subchapter gives a city no power to require building permits or apply its building code in the ETJ; 212.046 still blocks a building permit there until the city approves a development plat.

In the unincorporated county, go by that county's own pages. Read cover to cover, Local Government Code Chapter 233 grants a county no general building code and no building permit or inspection authority over a commercial building; Subchapter C is a fire code reserved for larger counties. Outside city limits, Travis County requires a Development Permit, and a commercial project files the non-residential version with a sealed cost estimate and an engineer-sealed site plan. Williamson County points elsewhere: to the County Engineer's Road and Bridge Division, (512) 943-3330, whose Certificate of Compliance confirms whether the property is in a floodplain, and its pages say the county issues no building permits and cannot issue a certificate of occupancy. That gap between two neighboring counties is why this site was built.

FromCity of Austin Development Services, commercial plan review (read September 20, 2026). FromCity of Austin Development Services, relocation permit, and City of Austin Planning, jurisdictional matters (read September 20, 2026). FromTexas Legislature Online, Local Government Code Chapter 212, municipal regulation of subdivisions and property development (read September 20, 2026). The statute was read in full and grants no such authority. FromTexas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026).

Which office permits the building, the city's plan review or the county?

Inside Austin, the city does. Development Services has published target review times from July 15, 2026: seven business days for new construction up to 10,000 square feet, 10 business days up to 25,000, and 20 business days beyond that. Before the commercial building permit application goes in, a site plan, a site plan correction or a site plan exemption must already be in place.

Past the city limits, the county does, within limits the statute sets. Local Government Code 233.061 allows a county of more than 250,000 residents, or one bordering such a county, to adopt a fire code; 233.062 confines that code to three building types (commercial establishments, public buildings, and multifamily dwellings with four or more units); and 233.063 requires a county permit before a covered building goes up, granted or refused within 30 days. A house-lot shop and a farm building fall outside all three types.

The table lists what each county's own site says about permits past its city limits. "Nothing listed" in a row describes what that county publishes, not whether rules exist: floodplain and septic permits and the state rules further down this page apply regardless. County sheets: Travis, Williamson, Bastrop, Caldwell, Lee and Burnet.

Half the six add a county fire code permit for a commercial building. Travis County Code Chapter 201, on the 2021 International Fire Code, requires plan review and a Fire Marshal building permit before any commercial establishment is built in the unincorporated county, and its definition of a commercial establishment leaves out private garages, carports, sheds and agricultural buildings. Unincorporated Williamson County has run the 2018 International Fire Code since November 2020, with a Fire Marshal permit required before construction. Caldwell County's fire code, on the 2024 edition, took effect August 13, 2026. City or county permits around Austin lays out the split, and permit offices by county fits it on one page. Inside the City of Austin, the count of accessory building and garage permits issued from 2021 to 2026 is broken out in Austin accessory permits, ZIP by ZIP.

Building permits past the city limits, as each county's site listed them on 2026-09-20.

On a phone this table scrolls sideways.

CountyWhat the county issues past its citiesDesk and phone
TravisDevelopment Permit; commercial projects file the non-residential version with an engineer-sealed site plan, and a commercial establishment adds a Fire Marshal building permit.TNR Development Services, (512) 854-4215; Fire Marshal, (512) 854-4621
WilliamsonRead, not listed: the county issues no building permits and cannot issue a certificate of occupancy; its Certificate of Compliance checks the floodplain. A commercial establishment needs the Fire Marshal's fire code permit.County Engineer, Road and Bridge, (512) 943-3330; Fire Marshal, (512) 943-3831
BastropDevelopment permit for any external development; for commercial use, no building permit, certificate of occupancy or building code. No fire marshal or fire code listed.Development Services, 211 Jackson Street, Bastrop, (512) 581-7176
CaldwellCommercial Site Construction Permit with engineer-certified drawings and 30 business days of technical review; no building code adopted. County fire code permit starting August 13, 2026.Sanitation and Development Services, Lockhart, (512) 398-1803; Fire Marshal's Office, 110 S. Main St., Lockhart
LeeDevelopment Permit for any structure larger than 100 square feet, commercial included; nothing said about a building code, plan review, fire code or fire marshal.Development Services, Lee County Annex, Giddings, (979) 212-8070
BurnetCounty building permit in two classes: Class A outside a flood hazard area, $25, no inspection; Class B inside one, $400, with an elevation certificate. No building code or plan review stated.Development Services, 220 S Pierce Street, Burnet, (512) 756-5445

FromCity of Austin Development Services, commercial plan review (read September 20, 2026). FromCity of Austin Development Services, site plans, exemptions and corrections, and Land Development Code 25-5-2 on Municode (Supp. No. 174) (read September 20, 2026). The statute was read in full and grants no such authority. FromTexas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026). The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026). FromWilliamson County Fire Marshal, construction permits, and the Williamson County Fire Code, second edition (read September 20, 2026). FromBastrop County Development Services, and the Development Services application fees (read September 20, 2026). FromCaldwell County Development Ordinance, revised February 14, 2023, and the subdivision and development fee schedule (read September 20, 2026). FromCaldwell County Fire Code adopted August 13, 2026, and the order adopting it (read September 20, 2026). FromLee County Development Services Department, and its Instructions for Application for Proposed Development, which carry the 100 square foot line and the fee schedule (read September 22, 2026). FromBurnet County, on-site sewage facilities and development permits (read September 20, 2026).

Does the $50,000 accessibility line reach your building?

For a business building estimated at $50,000 or more to construct, yes, and registration comes ahead of the local permit. The Texas Department of Licensing and Regulation says a project under $50,000 goes in for neither registration nor plan review, though the Texas Accessibility Standards still govern it, while a project at $50,000 or more submits a complete set of construction documents under its Rule 68.50. Government Code 469.101 writes the same threshold into law.

The covered buildings are listed in Government Code 469.003, which has two privately funded categories: public accommodations and commercial facilities, both as the Americans with Disabilities Act defines them. Single-family homes are not on the list, and subsection (c) carves out space inside a religious organization's building that is used primarily for religious rituals. The statute goes no further than those categories. Whether a particular building is an ADA public accommodation or commercial facility is for the design professional to decide against 469.003, and a church or assembly building is the one to raise with the department early.

The deadline is where schedules slip. Under Government Code 469.102 the architect or engineer holding overall design responsibility files within 20 days of issuing the plans, and a local permit official cannot accept an application for a building over the threshold until the registration is verified. Fees, the post-completion inspection and the under-threshold special registration are on the state accessibility review sheet.

FromTexas Department of Licensing and Regulation, Architectural Barriers frequently asked questions (read September 20, 2026). FromTexas Legislature Online, Government Code Chapter 469, elimination of architectural barriers (read September 20, 2026).

Who seals the drawings, and why does the slab come before the steel?

A pre-engineered metal building is a steel frame the manufacturer designs and cuts to your dimensions, loads and site: rigid frames, purlins and girts, sheeting, plus drawings and column reactions that tell the foundation engineer how hard the frame will push and pull on the slab.

Whether the building's own drawings need a Texas professional engineer's seal depends on size and use. Occupations Code 1001.056 lets plans go without an engineer's license when the building clears three limits (one story, 5,000 square feet of total floor area or less, and no clear span between supports wider than 24 feet across the narrow dimension) and the public is offered no engineering services. When a span runs past 24 feet, only the roof-supporting members, meaning the trusses, beams and the like, have to be engineered or pre-engineered. Also outside the engineering requirement under that section: a private dwelling, any garage or other structure that goes with one, and a private building used solely for farming, ranching or agriculture. A commercial-use metal building or a warehouse bigger than those limits is outside the exemption, and in Austin any plans for work in a building over 5,000 square feet must be sealed by a professional engineer, with a site-specific geotechnical report for new construction.

Architects are a separate check. Under Occupations Code 1051.606, someone not presenting themselves as an architect may prepare plans without an architect's license for a privately owned commercial building up to two stories or 20,000 square feet, a warehouse with limited public access, or a privately owned farm, ranch or agricultural building.

The slab is the next drawing, and it is decided by the frame reactions and the dirt together. Around Austin the dirt changes at one line. The 1974 Soil Survey of Travis County places the county across the Balcones Escarpment, with western soils formed over limestone, dolomite and marl and eastern soils over clay and chalky marl. To the east the survey classes the Blackland Prairie soils as mostly high shrink-swell clays and states plainly that their shrinking and swelling does much damage to building foundations. To the west, the Brackett association (shallow gravelly loams over limestone and marl) makes up about 38 percent of the county.

Williamson County's 1983 survey tells the same story: limestone soils of the Grand Prairie on the west side, Blackland Prairie clays through the center and east. The Branyon-Houston Black-Burleson unit, roughly 27 percent of the county, has high shrink-swell potential, and the survey warns that buildings and streets on it buckle and crack unless properly built. West of Interstate 35, the Eckrant and Denton units sit on limestone that makes a good foundation base but is hard to dig.

Ten miles can put the same shop on different ground, and only a soil report read with the frame reactions tells the foundation engineer what to draw. One licensing rule tracks the clay: Occupations Code 1001.056(c) pulls the small-building engineering exemption from a residential slab on expansive soil unless the work meets the International Residential Code as the jurisdiction applies it. Sequence: soil report, frame reactions, foundation design, then the slab, with anchor bolts set to the manufacturer's template before the steel is delivered. Slab and anchor design takes each step in turn, and pad, grading and stormwater acreage covers the ground beneath.

FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026). FromCity of Austin Development Services, commercial building plan review and inspection permit fees (FY 2025-26) and the commercial building application checklist (read September 20, 2026). FromTexas Legislature Online, Occupations Code Chapter 1051, architects (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Travis County, Texas (1974), climate and parent material sections (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Travis County, Texas (1974), general soil map and engineering uses of the soils (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Williamson County, Texas (1983), natural resources and parent material (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Williamson County, Texas (1983), general soil map unit 1 and the Houston Black series (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Williamson County, Texas (1983), general soil map units 2, 3 and 6, the Eckrant series, and parent material (read September 20, 2026).

What does TCEQ have to approve before the ground is broken?

That depends on whether the ground drains toward the recharge zone, and for a single parcel the only honest answer is what TCEQ's official maps show. The Edwards Aquifer Protection Program, per TCEQ, covers eight counties; Travis and Williamson are the two of this site's six on that list, both handled by the Austin Regional Office, (512) 339-2929. A plan to build on the recharge, transition or contributing zone has to clear the program's review and approval first.

The construction general permit's definitions describe the contributing zone as land whose rainfall runoff drains downgradient into the recharge zone, lying upstream of it and generally to its north and northwest. In Travis County that is everything except the Colorado River watershed upstream of a point 1.3 miles above Tom Miller Dam; in Williamson County, everything except the Lampasas River watershed above the Stillhouse Hollow dam.

Any regulated activity in the contributing zone needs a Contributing Zone Plan under 30 TAC 213.21, approved before construction starts. TCEQ's decision page asks two questions: is the work a regulated activity, and will the disturbance reach five acres, or is the work one piece of a larger development or sale plan? Unless both answers are yes, the page says no plan is needed. TCEQ calls its map viewer informational and not fit for legal, engineering or surveying use, and no page read describes a written zone determination for a parcel, so the Austin Regional Office is where to ask. Fees and the review clock are on contributing zone plans, Travis and Williamson.

The second TCEQ file is stormwater, a state permit that starts at one acre of disturbed ground. Under general permit TXR150000 the tiers are set by acreage. Below one acre, with no larger common plan disturbing an acre or more: not regulated. One acre to under five: a small construction activity. Five acres or more, or a common plan that will reach five: a large one.

On a small site no Notice of Intent is filed. The operator has a stormwater pollution prevention plan working ahead of any construction and posts the signed small construction site notice, form TCEQ-20963, at least two days ahead, and TCEQ says that option needs no Notice of Intent, no Notice of Termination and no fee. From five acres up, a Notice of Intent and its fee go in through STEERS from the primary operator: $225 electronic, $325 on paper.

Add up everything disturbed, not just the building footprint: pad, driveway, parking and drainage work all count, and if the project belongs to a larger plan, the whole plan's acreage counts. On a site regulated under 30 TAC Chapter 213, Part II.C.5 of the same permit holds construction until the Edwards Aquifer plan is approved. The acreage tiers and the site notice are on pad, grading and stormwater acreage.

FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program (read September 20, 2026). FromTexas Commission on Environmental Quality, TPDES general permit TXR150000, 2023 construction general permit, Part I.B definitions (read September 20, 2026). FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program, what plans you might need, and the Contributing Zone Plan page (read September 20, 2026). The agency pages were read and describe no written parcel determination. FromTexas Commission on Environmental Quality, Edwards Aquifer map viewer (read September 20, 2026). FromTexas Commission on Environmental Quality, stormwater general permit for construction activities (TXR150000) (read September 20, 2026). FromTexas Commission on Environmental Quality, stormwater discharges from small construction activities, site notice steps (read September 20, 2026). FromTexas Commission on Environmental Quality, stormwater discharges from large construction activities, steps (read September 20, 2026). FromTexas Commission on Environmental Quality, stormwater discharges from construction activities, less than one acre (read September 20, 2026).

Water, power and septic on a rural lot

A rural lot supplies its own water, power and septic, and the septic system is permitted before it goes in. Per TCEQ, building, installing, altering, extending or repairing an on-site sewage facility all need a permit, and the permitting authority owes an approval or denial within 30 days of receiving the application. The application goes to the county's local permitting authority, which TCEQ calls an authorized agent: Travis County Development Services for unincorporated Travis County, and the Williamson County Engineer's Office for Williamson County. The system, not the label commercial, decides who designs it. Under 30 TAC 285.5, planning materials come from a professional engineer or professional sanitarian when the system is non-standard, when one large tract carries several systems, and for every new system in the Edwards Aquifer recharge zone. Each county's septic desk and posted fees are on septic, well and power hookups.

Power depends on which utility's territory holds the lot. In Austin Energy territory, a commercial project first gets its site plan approved by Development Services, then files an intake request in the Austin Build + Connect portal; the owner installs new Austin Water connections from plans a Texas licensed professional engineer prepares. Pedernales Electric Cooperative's tariff names Burnet, Caldwell, Travis and Williamson among the counties it may serve; Bluebonnet Electric Cooperative has retail centers in Bastrop, Lockhart, Giddings and Manor; Oncor is the wires company in parts of Williamson County; Bartlett Electric Cooperative serves parts of Williamson and Lee counties. State highway driveway: a TxDOT Austin District permit. County road driveway: the county's permit, where its site lists one. Both are on driveway permits.

FromTexas Commission on Environmental Quality, getting a permit for an OSSF such as a septic system (read September 20, 2026). FromTexas Commission on Environmental Quality, RG-472 on-site sewage facility rules compilation, 30 TAC 285.5 and 285.32 (read September 20, 2026). FromAustin Energy, apply for electric service, and the City of Austin Utilities commercial fees and deposits page (read September 20, 2026). FromAustin Water, new service connections, the utility permitting office, and rates and fees (read September 20, 2026). FromPedernales Electric Cooperative, service for individual residential or commercial locations, and the tariff and business rules (read September 20, 2026). FromBluebonnet Electric Cooperative, line extensions, line design appointment, and the commercial developers package (revised June 4, 2024) (read September 20, 2026). FromOncor Electric Delivery, new construction (commercial) (read September 20, 2026). FromBartlett Electric Cooperative, about us, application for service, and service fees (read September 20, 2026). FromTexas Department of Transportation, Access Management Manual, chapter 2 section 4, permits, and the Use of Right of Way by Others Manual, access driveways (read September 20, 2026). FromTravis County TNR Development Services, commercial on-site sewage facility permit (read September 20, 2026). FromWilliamson County, on-site sewage facilities, and the OSSF program fee sheet (read September 20, 2026). FromTravis County TNR Development Services, commercial driveway permit (read September 20, 2026).

The erector and the package

The steel shows up as a package, and the erector makes it a building; for requests from this site, that is one independent metal building contractor. The contractor checks the anchor bolt pattern against the slab, raises the rigid frames, sets purlins and girts, squares and plumbs the frame, then hangs sheeting, trim and doors.

Owners reach that step by one of two routes. On the first, the owner buys the building from the contractor, who orders the package, gets the slab poured and erects it all under one contract. On the second, the owner buys the package direct from a manufacturer and still needs a slab and an erector: steel erection of pre-engineered kits. Metal building types, sorted by use:

What drives the cost, and the financing programs by name

No metal building contractor whose own site names Austin or these six counties posts a price for a finished building; each takes estimate requests by form or phone (read at the builders' own pages on 2026-09-20), so no such price appears here. The record's only published figure is a Texas manufacturer's price for a bare steel kit, printed only inside the labeled box on the cost sheet.

What moves the number: footprint and eave height, clear span, the wind loads the manufacturer designs for, doors, insulation, whether the building is heated and cooled, the slab the ground calls for, site work and the driveway, the utility extension, and agency fees, the one part anyone can quote ahead of time.

Financing, named and not priced. The U.S. Small Business Administration's 504 loan may be used to buy, build or renovate buildings or land, and not for working capital, inventory or investment in rental real estate. The SBA 7(a) loan lists buying or improving real estate and buildings among its permitted uses. The USDA Farm Service Agency's Farm Ownership Loans cover building farm structures, through the local FSA office. Each may be offered to an owner who qualifies; amounts and eligibility change, and the linked agency page is the current word. No published price exists for the finished building; the number depends on the lot.

The builders' own pages were read and print no such price. FromSeven Texas metal building company websites, five of them naming the Austin area (read September 20, 2026). FromMueller, Inc., Standard Series Big Workshop 30 x 40 x 12 and Big Barn XL 40 x 60 x 16 product pages, and its Texas branch location pages (read September 20, 2026). FromU.S. Small Business Administration, 504 loans, and the 504 loan program fact sheet for borrowers (read September 20, 2026). FromU.S. Small Business Administration, 7(a) loans, and the SBA lender resources page (read September 20, 2026). FromUSDA Farm Service Agency, Farm Ownership Loans, and the Farm Loans Overview fact sheet (October 2025) (read September 20, 2026).

Eight routing sheets for the steps above

  1. Metal building permits in Austin and Travis County: city desk or county desk

    Metal building permits in Austin and Travis County, TX: Austin's commercial plan review, the county development permit and what Williamson County lists instead.

  2. Austin-area metal buildings at $50,000 and up: the TDLR registration

    A metal building in Travis, Williamson or any Austin-area county at an estimated cost of $50,000 or more registers with TDLR for plan review and inspection.

  3. Contributing zone plans for metal buildings in Travis and Williamson County

    Metal buildings in Travis or Williamson County, TX on the Edwards Aquifer contributing zone: the TCEQ plan, the five-acre trigger, the review clock and the fee.

  4. Austin-area shop and warehouse hookups: septic, well water and power

    Shop and warehouse septic, well water and power in Travis, Williamson, Bastrop, Caldwell, Lee and Burnet counties: the septic office, the designer, the utility.

  5. Driveway permits for an Austin-area metal building: TxDOT road or county road

    Driveway permits for metal buildings in Travis, Williamson, Bastrop, Caldwell, Lee and Burnet counties, TX: TxDOT on state highways, the county on county roads.

  6. Slab and anchor design for an Austin-area metal building

    Slab and anchor design for a metal building around Austin, TX: who seals the plans, what the soil report is for, and what clay and limestone do to a foundation.

  7. Grading the pad for an Austin-area metal building: permits and stormwater acreage

    Clearing, pad grading and drainage for a metal building in Travis, Williamson and four more Austin-area counties: TCEQ stormwater tiers by acre and tree rules.

  8. What a metal building costs in Central Texas, and why no site can quote yours

    Metal building cost in Travis, Williamson, Bastrop, Caldwell, Lee and Burnet counties, TX: the drivers, one published kit price, and every agency fee, sourced.

  9. Metal building financing around Austin: which loan fits which building

    Metal building financing around Austin, TX: which SBA and USDA loan programs may fit a shop, warehouse, church, hay barn or rental building, and where to apply.

Nine building types, six county sheets

Questions on permits and pricing, from the record

Does building a metal building in the Austin area need a permit outside the city?

County by county, and each answer comes from that county's own site. Outside city limits Travis County requires a Development Permit, and a commercial establishment adds a Fire Marshal permit. Williamson County's pages say it issues no building permits and cannot issue a certificate of occupancy; its County Engineer's Road and Bridge Division, (512) 943-3330, issues a Certificate of Compliance that checks the floodplain. Bastrop, Caldwell, Lee and Burnet each list a county permit for construction past their city limits.

What comes first, the slab or the steel package?

In order: soil report, foundation design, slab, steel. The manufacturer's frame reactions and the ground under the lot decide the foundation together. The 1974 Travis County survey draws its line at the Balcones Escarpment, with deep blackland clay that cracks when dry on the east side and shallow stony soil over limestone on the west, and the 1983 Williamson County survey places the same change west of Interstate 35. Anchor bolts go into the slab on the manufacturer's template before the frames are delivered.

Does a shop under $50,000 skip TDLR registration?

Below $50,000 in estimated construction cost, the Texas Department of Licensing and Regulation says nothing goes in for registration or plan review, though the Texas Accessibility Standards still govern the building. At $50,000 or more, Government Code 469.101 sends a covered building's plans to the department, and a local permit official cannot accept the permit application before the registration is verified. Single-family homes are outside the covered categories; ADA public accommodations and commercial facilities are inside them.

Who prices a metal building in Travis or Williamson County?

No published price exists for one; the figure depends on the lot. Texas has no state license for home builders or general contractors, which is why this site calls no contractor licensed, and no contractor whose own site names Austin or these six counties posts a price for a finished building. The figure turns on span, height, doors, the slab the ground calls for, site work and the utility extension, all set by the specific lot; agency fees are the part that can be quoted ahead.

Pricing request, six fields, no charge

Price a metal building, county first

Fill it in this order: county first, since it names the permit desk; then the building; then the start window, which sets what gets looked at first.

By submitting this form, I agree that Central Texas Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

Each request is routed to one independent contractor and is not sold to any lead list.

By phone instead: (737) 345-0282.

Last stop on the routing sheet: the price

Each request is routed to one independent contractor and is not sold to any lead list.

Sources re-read September 20, 2026.

(737) 345-0282 Price my building, free