Central Texas Metal Buildings

Georgetown, Williamson County, TX

Metal buildings in Georgetown, Texas

A metal building in Georgetown is usually a shop or garage behind a house, an equipment barn on acreage or a steel commercial building on a business lot, and a request from this page goes to one independent metal building contractor, who decides which projects to take.

Which office reviews it depends on where the lot sits: inside the Georgetown city limits, in the city's extraterritorial jurisdiction (ETJ), or out in unincorporated Williamson County. Inside the limits, even a small storage building needs a permit, and its size is capped against the house.

Show the full introduction

In the ETJ, city permits reach a project only where Georgetown supplies the water, wastewater or electric service. Past both lines the county lists no building permit, and its floodplain, fire code, septic and driveway desks carry the review.

Inside Georgetown

Commercial building permit, 30 business day review

Georgetown requires a Commercial Building Permit application through My Government Online for new ground-up commercial construction, remodels, tenant finish-outs, additions and facade changes, with bookmarked PDF plans, the TDLR registration, a ComCheck and proof of transportation impact fees, and it will not accept the application until Planning has issued first-round site plan comments.

From City of Georgetown Building Inspections, 300-1 Industrial Ave. (read September 20, 2026).

Williamson County, outside city limits

No county building permit, building code or certificate of occupancy

Williamson County's own pages answer the building permit question by pointing to the County Engineer's Road and Bridge Division, which issues a Certificate of Compliance that verifies whether the property is in a floodplain, and say nothing else is needed from that office unless a driveway is being built.

The source was read and does not list this. From Williamson County, frequently asked questions, infrastructure and developers (read September 20, 2026).

Step one for a Georgetown lot: which side of the city limit it sits on. The ETJ, in between, is the first question below. The whole record is on that county's sheet.

Inside Georgetown, in its ETJ, or past it: who permits a metal building?

Check the city limits map first, because the answer changes three times. Inside the limits, Georgetown's permit list names a storage building, a carport, a new residential building and a new commercial building. Its exempt list covers minor fence repairs, low retaining walls, water tanks, finish work, shallow prefabricated pools, playground equipment and window awnings, and nothing on it is a shed or an accessory building, so even a small steel storage building goes through Building Inspections.

The ETJ turns on the utility bill. Where the address is in the ETJ and the city provides water, wastewater or electric service, city permits reach new commercial and residential construction, additions and remodels that carry plumbing or electric, and utility connections; the electrical permit applies only where Georgetown Utility Systems is the provider. There is no zoning in the ETJ, but subdivision, stormwater, utility evaluation, driveway and sign permits stay with the city, and a commercial project in Fire District No. 8 checks with Georgetown Fire for added permits.

That utility tie matters because state law gives the city no general reach out there: under Local Government Code 212.049, nothing in the development plat subchapter lets a city demand building permits in its ETJ. Past the ETJ, Williamson County's pages say it issues no building permits at all, and the county's other desks are on the Williamson County sheet. Round Rock draws its line another way: metal buildings in Round Rock.

FromCity of Georgetown, when do I need a permit (read September 27, 2026). FromCity of Georgetown Planning, extra-territorial jurisdiction (ETJ) and city limits (read September 27, 2026). FromTexas Legislature Online, Local Government Code Chapter 212, municipal regulation of subdivisions and property development (read September 20, 2026). The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026).

How large can a metal shop or garage be on a Georgetown house lot?

The cap is tied to the house, not the lot. The city's storage building handout, written to Section 6.06 of the development code in force today, holds an accessory building to 25 percent of the principal structure's square footage, with the garage left out of the house figure, and lets accessory buildings cover no more than 30 percent of the rear yard. Garages and carports sit at least 20 feet back from the street their driveway uses, or 10 feet from an alley, and only a structure eight feet tall or less may sit inside the rear setback, no closer than three feet to the property line and never in a utility easement.

That changes on November 1, 2026. The rewritten Unified Development Code, adopted August 11, 2026, keeps the 25 percent rule but adds a floor: 25 percent or 600 square feet, whichever is greater. It also keeps a residential accessory building no taller than the house, except that in the AG district a building tied to an agricultural use may go higher, up to the district maximum. A complete application pending before November 1 may still be reviewed under the old rules.

The paperwork goes through MGO Connect: an official site survey, drawings with width, length and height, a foundation plan and impervious cover numbers. Above 200 square feet the city requires an engineered foundation under ordinance 15.03.110. Review runs 15 to 20 business days, then come the inspections: the setback with the property pins exposed and a string line, the foundation before a pour, the framing when the building is built from scratch, and a final. The permit is good for six months. Size, door and span choices are on metal shops and workshops.

FromCity of Georgetown Inspection Services, storage building permit process and accessory building requirements, handout dated June 2025 (read September 27, 2026). FromCity of Georgetown, Unified Development Code page, and the Unified Development Code adopted August 11, 2026 (read September 27, 2026). FromCity of Georgetown, Unified Development Code adopted August 11, 2026, Sections 7.02 and 7.04 (read September 27, 2026).

What does Georgetown ask of a commercial metal building?

A Commercial Building Permit through My Government Online, and not before Planning has issued first-round site plan comments. The submittal carries bookmarked PDF plans, the TDLR registration, a ComCheck and proof of transportation impact fees. The city states a 30 business day turnaround with no expedited option and 25 business days for the first resubmittal, against the 2021 International codes and the 2023 National Electrical Code, in force since November 1, 2023. At $50,000 or more in total estimated cost, the state accessibility registration applies whatever the city decides.

The shape of the building is regulated too. Under Section 8.04 of the code taking effect November 1, 2026, a new non-residential building inside the city limits may not have a roof at or below a 2-to-12 pitch unless full parapet coverage is used, and the parapet rises at least two feet with cornice detailing, so the roof pitch belongs in the first conversation with whoever designs the steel. A wall facing a street, a park or a residential district may run no more than three times the building's average height without an offset, though a wall under 60 feet needs none, and every wall carries at least three listed architectural features. Buildings under 250 square feet and 15 feet tall are exempt, and so are agricultural buildings and permitted AG-district buildings set back 75 feet from every line. An Alternative Building Design request can put metal in front of the Director as part of an overall design. The commercial lane: commercial metal buildings.

FromCity of Georgetown, adopted building code (read September 27, 2026). FromTexas Department of Licensing and Regulation, Architectural Barriers frequently asked questions (read September 20, 2026). FromCity of Georgetown, Unified Development Code adopted August 11, 2026, Sections 8.01 and 8.04 (read September 27, 2026). FromCity of Georgetown Building Inspections, 300-1 Industrial Ave. (read September 20, 2026).

Is a Georgetown lot over the Edwards Aquifer recharge zone?

Some are, and the city layers its own rules on top of TCEQ's. Georgetown's recharge zone regulations, reenacted in 2015 and carried into Section 13.06, reach the city limits and the ETJ as far as state law allows, with TCEQ's official map deciding the zone. Apart from an exemption for small single-family and two-family lots, no development application over the recharge zone is approved until the city accepts a geologic assessment. Permanent controls have to remove 85 percent of total suspended solids under an engineer's certification, the two-year developed flow cannot rise, and spring and stream buffers apply, with the Georgetown salamander's springs handled under federal standards.

Paving counts as well. Over the recharge or contributing zone, non-residential development inside the city is held to its district maximum and never more than 70 percent impervious cover on five acres or less, and above five acres to 70 percent of the first five and 55 percent of the rest, with waivers never passing 70. On the state side, Williamson County is on TCEQ's program list and its Austin Regional Office answers at (512) 339-2929; a site partly on the recharge zone counts as recharge zone throughout and files a Water Pollution Abatement Plan. TCEQ calls its map viewer informational only, so the official maps and that office decide a parcel. Plan types and review clocks: contributing zone plans, Travis and Williamson.

FromCity of Georgetown, Unified Development Code adopted August 11, 2026, Section 13.06 (read September 27, 2026). FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program (read September 20, 2026). FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program, what plans you might need (read September 20, 2026). The agency pages were read and describe no written parcel determination. FromTexas Commission on Environmental Quality, Edwards Aquifer map viewer (read September 20, 2026).

Limestone or chalk: what sits under a Georgetown slab?

On the soil series that shares the town's name, hard limestone sits close to the surface. The 1983 Soil Survey of Williamson County described its typical Georgetown soil about a mile south-southwest of the courthouse: clay loam over reddish brown clay to about 35 inches, then indurated limestone. On the stony form of that soil, the survey says the rock is a stable base for foundations and streets, yet the shallow depth makes foundations and buried utilities difficult and costly, the clay subsoil corrodes buried pipe, and a septic field works poorly in the clay and can contaminate water supplies if it is placed in fractured rock.

East of town the survey found chalk and marl: its typical Austin and Castephen soils sit out Farm Road 971, and it names shrink-swell as a limitation of Austin silty clay for roads and foundations. The rock underneath tilts. A U.S. Geological Survey report on the Georgetown area describes layers dipping east-southeast 50 to 100 feet per mile, broken by several faults of the Balcones fault zone. No survey replaces a soil report on your own pad. The engineering side: slab and anchor design.

FromUSDA Soil Conservation Service, Soil Survey of Williamson County, Texas (1983), the Georgetown, Austin and Castephen series and parent material (read September 27, 2026). FromU.S. Geological Survey, Reassessment of the Georgetown limestone as a hydrogeologic unit of the Edwards Aquifer, Georgetown area, Texas (WRI 88-4190), publication page (read September 27, 2026).

Who connects power and septic to a new Georgetown building?

Check the provider map before anything is drawn. Georgetown Utility Systems serves addresses inside its service boundary, and the city's construction page also links Oncor and Pedernales Electric Cooperative. City service starts with a line extension application through My Government Online, carrying CAD drawings, a load analysis and stamped MEP drawings. The design and cost estimate is paid within 90 days: half releases the letter of serviceability, and the full amount is collected before materials are ordered. A recorded easement and inspected pads, trench and conduit come next, and the meter goes in seven to 10 business days after the permanent power inspection.

The date to plan around is the equipment, because the city warns some materials can take six months or more. Septic stays with the county even here: the Williamson County Engineer's program covers the county outside Austin and treats everything but a single-family house as commercial. The full hookup sequence: septic, well and power hookups. Every step from lot to occupancy, in order: the Austin-area metal building route.

FromCity of Georgetown, electric line extension, and electric engineering construction information (read September 27, 2026). FromOncor Electric Delivery, new construction (commercial) (read September 20, 2026). FromPedernales Electric Cooperative, service for individual residential or commercial locations, and the tariff and business rules (read September 20, 2026). FromWilliamson County, on-site sewage facilities, and the OSSF program fee sheet (read September 20, 2026).

Permit stack for a metal building in Georgetown, TX

One row per permit or rule a metal building in or around Georgetown meets, with the desk to call and the page each answer was read from.

StepShort answerDesk to callRead at
A building inside the city limits City permit. A storage building and a carport are on the permit list, and no accessory building is on the exempt list. City of Georgetown Building Inspections, 300-1 Industrial Ave., (512) 930-2550 From City of Georgetown, when do I need a permit (read September 27, 2026). From City of Georgetown Building Inspections, 300-1 Industrial Ave. (read September 20, 2026).
An accessory building on a house lot 25 percent of the house today; 25 percent or 600 square feet, whichever is greater, from November 1, 2026. Engineered foundation over 200 square feet. City of Georgetown Building Inspections, (512) 930-2550 From City of Georgetown Inspection Services, storage building permit process and accessory building requirements, handout dated June 2025 (read September 27, 2026). From City of Georgetown, Unified Development Code adopted August 11, 2026, Sections 7.02 and 7.04 (read September 27, 2026).
A new commercial building Commercial Building Permit after first-round site plan comments; 30 business days, no expedited option. City of Georgetown Building Inspections, (512) 930-2550 From City of Georgetown Building Inspections, 300-1 Industrial Ave. (read September 20, 2026).
A lot in the ETJ City permits only where Georgetown supplies water, wastewater or electric. No zoning; the city keeps subdivision, stormwater, driveway and sign permits. City of Georgetown Building Inspections, (512) 930-2550 From City of Georgetown, when do I need a permit (read September 27, 2026). From City of Georgetown Planning, extra-territorial jurisdiction (ETJ) and city limits (read September 27, 2026).
A lot past the ETJ No county building permit listed. The $25 Certificate of Compliance is a floodplain check. Road and Bridge Division, Williamson County Engineer, (512) 943-3330 The source was read and does not list this. From Williamson County, frequently asked questions, infrastructure and developers (read September 20, 2026). From Williamson County, floodplain management, and the Certificate of Compliance form (read September 20, 2026).
A lot over the recharge zone City geologic assessment before any development approval; a TCEQ plan before construction. TCEQ Austin Regional Office, (512) 339-2929 From City of Georgetown, Unified Development Code adopted August 11, 2026, Section 13.06 (read September 27, 2026). From Texas Commission on Environmental Quality, Edwards Aquifer Protection Program (read September 20, 2026).
A septic system County Engineer's program; a commercial permit is $810 non-aerobic or $910 aerobic. Williamson County Engineer's Office, OSSF program, (512) 943-3330 From Williamson County, on-site sewage facilities, and the OSSF program fee sheet (read September 20, 2026).
New electric service A city line extension where Georgetown Utility Systems is the provider; Oncor or Pedernales Electric Cooperative elsewhere. Georgetown Utility Systems, 300-1 Industrial Ave., (512) 930-3640 From City of Georgetown, electric line extension, and electric engineering construction information (read September 27, 2026).
State accessibility review Registration and plan review at $50,000 or more in total estimated cost. Texas Department of Licensing and Regulation From Texas Department of Licensing and Regulation, Architectural Barriers frequently asked questions (read September 20, 2026).

Questions on a metal building in Georgetown

Does a small metal storage building in Georgetown need a city permit?

Inside the city limits, yes. Georgetown's permit list names a storage building, and the building work on its exempt list does not include a shed or any accessory building. Above 200 square feet the city's storage building handout requires an engineered foundation, and review takes 15 to 20 business days.

How big can a detached shop be behind a house in Georgetown?

The city's handout, written to the code in force before November 1, 2026, caps an accessory building at 25 percent of the principal structure's square footage, not counting a garage. The code taking effect that day allows 25 percent or 600 square feet, whichever is greater. Under both, accessory buildings may cover no more than 30 percent of the rear yard.

Do Georgetown building permits apply in the ETJ?

Only when Georgetown supplies the lot's water, wastewater or electricity. Then city permits cover new commercial and residential construction, additions and remodels with plumbing or electric, and utility connections, and the electrical permit applies only where Georgetown Utility Systems is the provider. There is no zoning in the ETJ, and the city still reviews subdivision, stormwater, driveway and sign permits there.

Can a commercial metal building in Georgetown have a low-slope roof?

Not without a parapet under the code taking effect November 1, 2026. Section 8.04 prohibits a roof at or below a 2-to-12 pitch on a new non-residential building inside the city limits unless full parapet coverage is used, and the parapet extends at least two feet above the roof line with cornice detailing. Agricultural buildings, and permitted AG-district buildings set back 75 feet from every property line and right-of-way, are exempt.

Pricing request, six fields, no charge

Price a metal building in Georgetown

Fill it in this order: county first, since it names the permit desk; then the building; then the start window, which sets what gets looked at first.

By submitting this form, I agree that Central Texas Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

Each request is routed to one independent contractor and is not sold to any lead list.

By phone instead: (737) 345-0282.

Last stop on the routing sheet: the price

Each request is routed to one independent contractor and is not sold to any lead list.

Sources re-read September 20, 2026.

(737) 345-0282 Price my building, free