TCEQ's official maps settle it, and this page cannot substitute for them. Per TCEQ, the regulated zone boundaries were drawn on USGS topographic base maps and are kept in its offices; its online viewer shows whether a project lies over a regulated zone, but it is informational only and not fit for legal, engineering or surveying use. No TCEQ page read describes a formal written zone determination for a parcel. What the pages do offer: the viewer, and the regional desk for Travis, Williamson and Hays, the Austin Regional Office, reached at (512) 339-2929.
For these two counties the rule describes a watershed, not a list of parcels. The construction general permit's definitions describe the contributing zone as land, or watershed, whose rainfall runoff drains downgradient into the recharge zone, lying upstream of it and generally to its north and northwest. Travis County: everything except the Colorado River watershed upstream of a point 1.3 miles above Tom Miller Dam. Williamson County: everything except the Lampasas River watershed upstream of the Stillhouse Hollow dam. As for the recharge zone itself, it is whatever the official maps kept in TCEQ offices and the regional office designate.
The honest sequence, then: read the definition, check the viewer, and confirm with the regional office before anyone prices the site work. The zone question sits ahead of the slab design, because the answer changes what needs approval first.
The agency pages were read and describe no written parcel determination. FromTexas Commission on Environmental Quality, Edwards Aquifer map viewer (read September 20, 2026).
FromTexas Commission on Environmental Quality, TPDES general permit TXR150000, 2023 construction general permit, Part I.B definitions (read September 20, 2026).
FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program (read September 20, 2026).