Metal building permits and contractors in Travis County: which office issues the permit

In Travis County, a metal building inside Austin is permitted by the city through Development Services commercial plan review, and a metal building outside every city limit gets a county Development Permit from Travis County Transportation and Natural Resources, plus a Fire Marshal building permit if it is a commercial establishment.

That city line comes first, because it sets which office reads the plans, which code they are read against, how long the review runs and what it costs. Bee Cave, West Lake Hills, Pflugerville, Lakeway, Manor, Lago Vista, Jonestown, Sunset Valley and Rollingwood each run their own permit desk, and a lot in Austin's extraterritorial jurisdiction goes to the county.

Show the full introduction

The line between the two runs through this county, and every answer below was read on 2026-09-20 at the office that gives it: the development permit and what it leaves out, the Fire Marshal, the floodplain, septic and driveway desks, the Edwards Aquifer contributing zone, the $50,000 accessibility line, the clay and the limestone under the slab, and who turns the power on.

Inside Austin

Commercial plan review, seven to 20 business days by size

Inside Austin a building permit is required to erect, construct, enlarge, alter, repair, improve, remove, convert, move or demolish any building or structure within the city's zoning jurisdiction, and a commercial building goes through the Development Services Department's commercial plan review under the locally amended 2024 International Building Code, in force since July 10, 2025.

What the county's page says

A site plan, site plan correction or site plan exemption has to be in place before a commercial building permit application, and the two are reviewed together only with an approved concurrent review request.

From City of Austin Development Services, 6310 Wilhelmina Delco Drive (read September 20, 2026).

Travis County, outside city limits

County development permit, plus a Fire Marshal permit for a commercial building

Outside city limits, Travis County requires a Development Permit, and its definition of development covers buildings and other structures, driveways, right-of-way work and on-site sewage facilities.

What the county's page says

A commercial project that is not a dwelling applies for a Development (Non-Residential) permit with a sealed construction cost estimate and a site plan sealed by a Texas-licensed engineer, and a pre-construction meeting sets which inspections apply.

From Travis County TNR Development Services, Commercial Site Plan (read September 20, 2026).

Step one on this sheet: find the desk that has your lot. Everything below follows from it.

Inside Austin or outside it: which office permits a metal building in Travis County?

The city line picks the office. Inside Austin, a building permit is required for any building or structure erected, enlarged or altered within the city's zoning jurisdiction, and a commercial building is reviewed by Development Services under the 2024 International Building Code with Austin's amendments, in force since July 10, 2025. The site plan comes first: a site plan, a site plan correction or a site plan exemption has to exist before the commercial building permit application, and the two run together only on an approved concurrent review request. From July 15, 2026 the department's target for new construction is seven business days up to 10,000 square feet, 10 business days from 10,001 to 25,000 and 20 business days above that.

Outside every city limit in Travis County, the county requires a Development Permit, and development, as it defines the word, covers buildings and other structures, driveways, right-of-way work and on-site sewage facilities alike. A commercial project that is not a dwelling files the Development (Non-Residential) permit with a construction cost estimate and a site plan, both sealed by a Texas-licensed engineer, and a pre-construction meeting sets which inspections apply. A commercial establishment also needs the Fire Marshal building permit before construction, which the next section covers. The two branches sit side by side with their sources in the switch at the top of this page; the split in full, set against what Williamson County lists, is on city or county permits around Austin.

A lot in Austin's extraterritorial jurisdiction goes to the county desk: the city states that it does not issue new construction permits in its ETJ and sends those applicants to the county, and the county's non-residential checklist asks for a city signature or permit before a county permit issues in any city's ETJ. Bee Cave's page lists new construction and structural changes among the work that needs its permit, and West Lake Hills says first comments on a complete commercial application take up to four weeks; both print with their sources in the cities table below. Pflugerville's permit desk, codes and fees have a sheet of their own: metal buildings in Pflugerville. Lakeway, Manor, Lago Vista, Jonestown, Sunset Valley and Rollingwood run their own permits, and this page states nothing about what each asks, because their pages were not read.

FromCity of Austin Development Services, commercial plan review (read September 20, 2026). FromCity of Austin Development Services, site plans, exemptions and corrections, and Land Development Code 25-5-2 on Municode (Supp. No. 174) (read September 20, 2026). FromCity of Austin Development Services, building technical codes (read September 20, 2026). FromCity of Austin Development Services, relocation permit, and City of Austin Planning, jurisdictional matters (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026). FromTravis County TNR, non-residential development checklist (read September 20, 2026).

What does the Travis County development permit review, and what does the Fire Marshal add on a commercial building?

Less than the name suggests at the development desk, and a full code review at the Fire Marshal's. The county pages read state no building code edition for the development permit and describe no structural plan review by the development office. What the Non-Residential Development Checklist, revised May 11, 2023, does set are site triggers: a stormwater pollution prevention plan at one acre or more of disturbance, possible permanent water quality controls above 10,000 square feet of new impervious cover, an environmental resource inventory above 10,000 square feet of disturbance, a 45 percent impervious cover limit unless the driveway is on a state road, and a traffic impact analysis determination worksheet for a new county driveway. The FY2026 fee is $137 per non-residential application plus $1.99 per $1,000 of construction valuation outside the Austin ETJ, or $66 plus $1.99 inside it, rising on October 1, 2026 to $158 plus $2.29 per $1,000 ($76 inside the ETJ) with a new $15 IT service fee; a pre-development meeting is $543 on the new schedule.

The Fire Marshal is where a commercial metal building's plans get read against a code. Travis County Code Chapter 201, the county fire code adopted under Local Government Code Chapter 233, Subchapter C, requires plan review and a Fire Marshal building permit before construction or substantial improvement of any commercial establishment, public building or multifamily building of more than three units in the unincorporated county. The chapter was replaced effective January 1, 2026, adopts the 2021 International Fire Code with local amendments, adopts the International Building Code by reference, and makes the Fire Marshal both the county fire code official and the building code official. The definition of commercial establishment leaves out private garages, carports, sheds and agricultural buildings, so an equipment barn or a garage on a house lot is not on its list; a warehouse, a shop that runs a business or a retail building is.

The clock and the fee come from the same chapter and the statute behind it. Local Government Code 233.063 has the commissioners court issue or deny the permit within 30 days of the application, with no action in 30 days counting as approval, and the Travis County page repeats both. Permit fees are tiered by construction value from an ICC valuation table: $790 under $200,000, $790 plus $1.75 per $1,000 from $200,000 to under $1,000,000, $2,800 plus $1.00 per $1,000 from $1,000,000 to under $5,000,000, and $10,900 plus $0.50 per $1,000 at $5,000,000 or more. Plans go in as digital 24 by 36 PDFs stamped by a Texas licensed engineer through tcfmopermits.com, carrying a TNR development permit application number, so the development permit application is filed first. The final inspection begins within two business days of a written request, and a Certificate of Compliance is required before the building opens to the public. The office is at 700 Lavaca Street, Suite 1101, Austin, (512) 854-4621.

FromTexas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County TNR, non-residential development checklist (read September 20, 2026). FromTravis County TNR, FY2026 and FY2027 development related fee schedules (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026).

Who handles the floodplain, the septic system and the driveway in Travis County?

One department, three desks, all reached at (512) 854-4215. The floodplain desk is Travis County Code Chapter 464: a development permit is required before any construction or development in the unincorporated county, an A permit as the basic development permit and a B permit as the Special Flood Hazard Area permit, both through the Floodplain Administrator with scaled plans showing topography, the structures, the floodplain location and lowest floor elevations. The county has floodplain jurisdiction only outside city limits, the Administrator can issue a stop work order, and a violation is a Class C misdemeanor at up to $500 per day. The county pages read do not name the person who holds the title.

The septic desk is Travis County Development Services, the TCEQ authorized agent for on-site sewage facilities in unincorporated Travis County and in cities with interlocal agreements. TCEQ calls the local permitting authority an authorized agent and keeps no static list of them by county. Inside 1,000 feet of Lake Travis, septic permitting belongs to the Lower Colorado River Authority, and the county development permit is still needed; TCEQ's directory lists LCRA for the restricted and water quality zones of Lake Travis and for Jonestown, Lago Vista, Lakeway, Briarcliff and Volente, at (512) 578-3216. A commercial system files the Non-Residential OSSF application separately from the development or driveway permit, with a soil evaluation, a plot plan showing wells within 150 feet, a 25-year floodplain statement, a maintenance affidavit for an aerobic or drip system, and an environmental resource inventory when developing an acre or more. FY2026 fees: a private sewage permit up to 500 gallons a day is $712 plus $125 per additional 500 gallons, an engineered construction permit up to 500 gallons a day is $1,262, plus a $10 TCEQ state fee; on October 1, 2026 those become $819 and $1,452.

The driveway desk depends on who maintains the road. A driveway onto a maintained Travis County road needs a Travis County Driveway Permit, usually issued with the non-residential development permit, at $165 in FY2026 and $190 from October 1, 2026. Rural culverts are corrugated metal pipe of at least 18 inches, or a 15 by 21 inch oval, with concrete safety end treatments, and a commercial driveway runs 12 to 25 feet wide. On a road the county does not maintain it issues no driveway permit, and a state-highway driveway is TxDOT's permit instead: Form 1058 goes to the Austin District, and the district has to execute it and take its 24 hours of notice before anything moves on the state right of way. Utility work in the county right-of-way is a separate utility installation permit with an engineer-sealed plan and a restoration bond of at least $5,000.

FromTexas Commission on Environmental Quality, getting a permit for an OSSF such as a septic system (read September 20, 2026). FromTexas Commission on Environmental Quality, OARS authorized agent record, Lower Colorado River Authority (read September 20, 2026). FromTexas Department of Transportation, Access Management Manual, chapter 2 section 4, permits, and the Use of Right of Way by Others Manual, access driveways (read September 20, 2026). FromTravis County TNR, floodplain maps, and Travis County Code Chapter 464 (read September 20, 2026). FromTravis County TNR Development Services, commercial on-site sewage facility permit (read September 20, 2026). FromTravis County TNR Development Services, commercial driveway permit (read September 20, 2026).

Does the Edwards Aquifer contributing zone reach your lot in Travis County?

Part of the county, yes, and which parcels is for TCEQ's official maps to say. Travis is on the eight-county list for TCEQ's Edwards Aquifer Protection Program, and its desk, shared with Williamson and Hays, is the Austin Regional Office, (512) 339-2929; building on the recharge, transition or contributing zone waits for the program to review and approve a plan. For Travis County, the construction general permit's definition (citing 30 TAC 213.3) takes in everything except the Colorado River watershed upstream of a point 1.3 miles above Tom Miller Dam, meaning the land whose runoff drains downgradient into the recharge zone, lying upstream of it and generally to its north and northwest.

Under 30 TAC 213.21, any regulated activity in the contributing zone needs a Contributing Zone Plan, approved before construction starts. TCEQ's decision page runs two checks: is it a regulated activity, and will the disturbance reach five acres or belong to a larger plan of development or sale? Unless both answers are yes, the page says no plan is needed. Whether a single lot falls inside the line is answered only by the official maps TCEQ keeps in its offices; its online viewer is labeled informational and unfit for legal, engineering or surveying use, and no page read describes a written parcel determination, so the confirming call goes to the regional office. Plan, clock and fee form: contributing zone plans, Travis and Williamson.

One more district reaches part of Travis County and stops at the wellhead. The Barton Springs Edwards Aquifer Conservation District covers 430 square miles in parts of Travis, Hays and Caldwell counties, registers every well inside it and permits a new Edwards or Trinity well, and its pages describe nothing that reaches a building owner who is not drilling or owning a well.

FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program (read September 20, 2026). FromTexas Commission on Environmental Quality, TPDES general permit TXR150000, 2023 construction general permit, Part I.B definitions (read September 20, 2026). FromTexas Commission on Environmental Quality, Edwards Aquifer Protection Program, what plans you might need, and the Contributing Zone Plan page (read September 20, 2026). The agency pages were read and describe no written parcel determination. FromTexas Commission on Environmental Quality, Edwards Aquifer map viewer (read September 20, 2026). FromBarton Springs Edwards Aquifer Conservation District, well permits and forms (read September 20, 2026).

The $50,000 line, and who seals the sheets for metal building contractors in Travis County

Both questions are answered by the office before the statute gets a say. Inside Austin, all plans for work in a building over 5,000 square feet are sealed by a professional engineer, new construction lists structural plans with a site-specific geotechnical report, and the TDLR registration confirmation is part of the commercial application. Outside the cities, the county wants the site plan and the cost estimate sealed by a Texas-licensed engineer, and the Fire Marshal's plans arrive stamped by one. So on a commercial-use metal building in Travis County a Texas professional engineer seals the sheets, city desk or county desk.

The statute matters for the small building no office reads. Under Occupations Code 1001.056, plans need no engineer's license when the building stays at one story and within 5,000 square feet, every clear span 24 feet or shorter across the short side, and the public is offered no engineering services; spans longer than 24 feet shift the requirement onto the roof-supporting members alone, which must be engineered or pre-engineered. Outside the requirement too: a private dwelling, the garage that goes with it, and a private farm, ranch or agricultural building. Architects are a separate check: Occupations Code 1051.606 needs no architect for a warehouse with limited public access, or for a privately owned commercial building within the limit of two stories or 20,000 square feet. A metal shop on a house lot in the unincorporated county usually sits inside both exemptions; a warehouse usually sits outside the first.

The $50,000 line runs on estimated construction cost, not on the office. TDLR says a project whose total estimated cost is under $50,000 is not submitted for registration or plan review, though the Texas Accessibility Standards still apply to it, and a project of $50,000 or more submits a full set of construction documents under its Rule 68.50. Government Code 469.102 puts the duty to submit on the design professional with overall design responsibility, by the 20th day after the plans are issued, stops the owner applying for a local building permit until those plans are in, and stops a local permit official from accepting a permit application for a building subject to the line unless registration is verified. In Travis County that puts the TDLR submission ahead of the city or the county application, whichever desk has the lot.

FromCity of Austin Development Services, commercial building plan review and inspection permit fees (FY 2025-26) and the commercial building application checklist (read September 20, 2026). FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026). FromTexas Legislature Online, Occupations Code Chapter 1051, architects (read September 20, 2026). FromTexas Department of Licensing and Regulation, Architectural Barriers frequently asked questions (read September 20, 2026). FromTexas Legislature Online, Government Code Chapter 469, elimination of architectural barriers (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026).

Blackland clay east, Edwards limestone west: what Travis County ground does to a slab

The ground changes at a line that runs roughly along MoPac, and the slab design changes with it. The 1974 Soil Survey of Travis County puts the county astride the Balcones Escarpment, with elevation running from 400 feet in the east to 1,400 feet in the west: western soils formed over limestone, dolomite, interbedded limestone and marl, central soils over chalk, marl and limestone, eastern soils over clay, chalky marl and silty clay. The Bureau of Economic Geology's Geologic Wonders of Texas page on Central Texas puts the escarpment in Austin generally parallel to MoPac, with the fault zone extending two to five miles east of it, deep soils on the east side and thin, rocky ones on the west.

East of that line, the 1974 survey groups the Blackland Prairie associations as mainly clays with high shrink-swell potential, highly corrosive to pipes and poorly suited to septic systems; the Houston Black-Heiden association is about 21 percent of the county, and Houston Black is a deep clay that cracks when dry, is very slowly permeable when wet, and runs clay to 104 inches in the representative profile. The survey's own sentence is that shrinking and swelling causes much damage to building foundations, roads and other structures. On that ground the foundation engineer designs for movement first and load second. The Occupations Code follows the same clay: section 1001.056(c) withdraws the small-building engineering exemption for a residential slab on expansive soil unless the work meets the International Residential Code as applied in the jurisdiction.

West of the line, the same survey puts the Brackett association, shallow gravelly calcareous loams over interbedded limestone and marl, at about 38 percent of the county, and describes Tarrant soils as about eight inches of stony clay over limestone with rock covering 25 to 85 percent of the surface; for that ground it names breaking and moving massive limestone for site leveling, street grading or septic systems as the main urban limitation. A footing there has rock to bear on, and every beam trench is an excavation. Either side of the line the order is the same: a soil boring on the lot, the manufacturer's column reactions, the foundation design, then the slab with the anchor bolts set before the steel arrives, step by step on slab and anchor design.

FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026).

Who brings power and water to a metal building in Travis County?

Four utilities, sorted by where the lot is. In Austin Energy territory a commercial project, or any project over 350 amps single-phase or 225 amps three-phase, gets its site plan approved by Development Services first, then files an intake request in the Austin Build + Connect portal with an Electric Service Planning Application for every metered address, an AutoCAD site plan, a riser diagram and an address verification report. Austin Energy Design then produces the design with a preliminary time frame and estimated fees, the customer builds the civil work and metering, the city electrical permit and inspection follow, and service is requested at (512) 494-9400. A service availability letter comes back within two weeks of the request; the pages state no fixed design fee and no day count.

New Austin Water connections are installed by the property owner from a tap plan that only a Texas licensed professional engineer may submit, through the same portal, after the Utility Permitting Office at 6310 Wilhelmina Delco Drive, (512) 972-1000 option 3, determines new connections are needed. No building permit issues until the tap fees are paid, the owner needs a right-of-way permit before installing the connections, and a lot platted after October 1, 2023 pays impact fees of $4,800 for water and $2,900 for wastewater per service unit. On an ETJ lot that Austin Water or Austin Energy serves, the standalone trade permits for those connections are still the city's.

Past the city utilities, Pedernales Electric Cooperative's tariff lists Travis among the counties it may serve and Austin among its franchise cities. A location with no service is staked by the applicant, applied for at a district planning office at (877) 372-0391 with the $50 membership, $50 establishment and $200 system impact fees, designed once by PEC, and priced only after the account exists and a field meeting has taken place. Bluebonnet Electric Cooperative describes its territory as running from Travis County to Washington County and runs a retail center at Manor; new service starts with a line design appointment at (800) 842-7708, a load over 200 amps needs an electric load analysis, and a non-residential general service applicant pays the estimated extension costs above $350 per service. Which cooperative has the lot is the cooperative's answer, not this page's.

FromAustin Energy, apply for electric service, and the City of Austin Utilities commercial fees and deposits page (read September 20, 2026). FromAustin Water, new service connections, the utility permitting office, and rates and fees (read September 20, 2026). FromCity of Austin Development Services, relocation permit, and City of Austin Planning, jurisdictional matters (read September 20, 2026). FromPedernales Electric Cooperative, service for individual residential or commercial locations, and the tariff and business rules (read September 20, 2026). FromBluebonnet Electric Cooperative, line extensions, line design appointment, and the commercial developers package (revised June 4, 2024) (read September 20, 2026).

How does Travis County compare with Williamson and Bastrop next door?

On the same commercial metal building, the three county desks give three answers, and none of them borrows another's. Williamson County, to the north, lists no county building permit, no building code and no certificate of occupancy on its own pages; what it asks for is a $25 Certificate of Compliance verifying no 100-year floodplain at the site, and a Fire Marshal fire code permit for a commercial establishment under the 2018 International Fire Code. Bastrop County, to the east, issues a development permit for any external development, yet states that it issues neither building permits nor certificates of occupancy, keeps no county building code for commercial use, and lists no fire marshal or fire code at all. Travis County is the one of the three whose county desk reads a commercial building's plans against a building code, and it does that through the Fire Marshal.

Every step from the jurisdiction question to a finished building, for all six counties, is sequenced on the Austin-area metal building route.

One commercial metal building outside the cities, three county records, each read 2026-09-20.

On a phone this table scrolls sideways.

QuestionTravis CountyWilliamson CountyBastrop County
Building permit outside the citiesCounty Development (Non-Residential) permit with an engineer-sealed site plan and cost estimateNone listed; a $25 Certificate of Compliance verifying no 100-year floodplain at the developmentCounty development permit, Class A outside the floodplain or Class B inside it; no building permit or certificate of occupancy
Fire code permit for a commercial establishment, county levelFire Marshal building permit, 2021 International Fire Code, $790 under $200,000 of value, issued or denied within 30 daysFire Marshal fire code permit, 2018 International Fire Code, plan review at $125 per 1,000 square feet, no turnaround statedNone listed: no fire marshal, no fire code, no fire code permit
Building code the county statesNone stated for the development permit; the fire code adopts the International Building Code by referenceNone listed for a commercial or accessory structureNone for any use other than single-family homes and duplexes
Septic permit officeTravis County Development Services, (512) 854-4215; LCRA within 1,000 feet of Lake TravisCounty Engineer's Office, (512) 943-3330Development Services, Environmental and Sanitation, (512) 581-4042

FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026). FromTravis County TNR Development Services, commercial on-site sewage facility permit (read September 20, 2026). The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026). FromWilliamson County, floodplain management, and the Certificate of Compliance form (read September 20, 2026). FromWilliamson County Fire Marshal, construction permits, and the Williamson County Fire Code, second edition (read September 20, 2026). FromWilliamson County, on-site sewage facilities, and the OSSF program fee sheet (read September 20, 2026). FromBastrop County Development Services, and the Development Services application fees (read September 20, 2026). FromBastrop County Development Services, environmental and sanitation, and the application fees (read September 20, 2026).

County desks outside city limits, Travis County, TX

One row per county permit or rule that reaches a building past the city limits: what its own pages list, the desk and number to call, and the document and date it was read from.

Permit or county ruleCounty's own listingDesk to callRead at
Building permit outside city limits Outside city limits, Travis County requires a Development Permit, and its definition of development covers buildings and other structures, driveways, right-of-way work and on-site sewage facilities. A commercial project that is not a dwelling applies for a Development (Non-Residential) permit with a sealed construction cost estimate and a site plan sealed by a Texas-licensed engineer, and a pre-construction meeting sets which inspections apply. A non-habitable accessory building on a residential lot, such as a shed, gets a Development (Residential) permit and states its International Residential Code year on the application. The county pages read state no building code edition for the development permit and describe no structural plan review by the development office. Travis County Transportation and Natural Resources, Development Services, Permit Desk, (512) 854-4215 From Travis County TNR Development Services, Commercial Site Plan (read September 20, 2026).
County development permit fees The FY2026 development fee schedule, effective January 1, 2026, prices a non-residential development permit at $137 per application plus $1.99 per $1,000 of construction valuation outside the Austin extraterritorial jurisdiction, or $66 plus $1.99 per $1,000 inside it; a residential A permit is $149 and a residential B permit in the special flood hazard area is $287. On October 1, 2026 those rows rise to $158 plus $2.29 per $1,000 ($76 inside the Austin ETJ), $172 and $331, with a new $15 IT service fee per application. A pre-development meeting is listed at $543 on the new schedule. Travis County Transportation and Natural Resources, Development Services, (512) 854-4215 From Travis County TNR, FY2026 and FY2027 development related fee schedules (read September 20, 2026).
County fire code permit for a commercial building Travis County Code Chapter 201, the county fire code adopted under Local Government Code Chapter 233, Subchapter C, requires plan review and a Fire Marshal building permit before construction or substantial improvement of any commercial establishment, public building or multifamily building of more than three units in the unincorporated county, and before a change of use in an existing building. The chapter was replaced effective January 1, 2026 and adopts the 2021 International Fire Code with local amendments; it adopts the International Building Code by reference and makes the Fire Marshal the county fire code official and building code official. The commercial establishment definition excludes private garages, carports, sheds and agricultural buildings. Permit fees are tiered by construction value: $790 under $200,000; $790 plus $1.75 per $1,000 from $200,000 to under $1,000,000; $2,800 plus $1.00 per $1,000 from $1,000,000 to under $5,000,000; $10,900 plus $0.50 per $1,000 at $5,000,000 or more, with value taken from an ICC valuation table. The Commissioners Court issues or denies the permit within 30 days of the application and fee, a building is deemed approved if nothing happens in 30 days, the final inspection begins within two business days of a written request, and a Certificate of Compliance is required before a facility opens to the public. Plans go in as digital 24 by 36 PDFs stamped by a Texas licensed engineer through tcfmopermits.com with a TNR development permit application number. Travis County Fire Marshal's Office, 700 Lavaca Street, Suite 1101, Austin, (512) 854-4621 From Travis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026).
Floodplain development permit Travis County Code Chapter 464 requires a development permit before any construction or development in the unincorporated county: an A permit is the basic development permit and a B permit is the Special Flood Hazard Area development permit, both applied for through the Floodplain Administrator with scaled plans showing topography, the structures, the floodplain location and lowest floor elevations. The county has floodplain jurisdiction only outside city limits. The Floodplain Administrator may issue stop work orders, and a Chapter 464 violation is a Class C misdemeanor with a fine of up to $500 per day. The county pages read do not name the person who holds the Floodplain Administrator title. Travis County Transportation and Natural Resources, Floodplain Administrator, (512) 854-4215 From Travis County TNR, floodplain maps, and Travis County Code Chapter 464 (read September 20, 2026).
On-site sewage facility (septic) permit Travis County Development Services is the TCEQ authorized agent for on-site sewage facilities in unincorporated Travis County and in cities with interlocal agreements; inside 1,000 feet of Lake Travis the septic permit is the Lower Colorado River Authority's, though the county development permit still applies there. A commercial system uses the Non-Residential OSSF application, filed separately from the development or driveway permit, with a soil evaluation, a plot plan showing wells within 150 feet and a 25-year floodplain statement, a maintenance affidavit for an aerobic or drip system, and an environmental resource inventory when developing an acre or more. FY2026 fees, effective January 1, 2026: a private sewage permit up to 500 gallons a day $712 (plus $125 per additional 500 gallons), an engineered construction permit up to 500 gallons a day $1,262, and a $10 TCEQ state fee; on October 1, 2026 those become $819 and $1,452. Travis County Transportation and Natural Resources, Development Services, (512) 854-4215 From Travis County TNR Development Services, commercial on-site sewage facility permit (read September 20, 2026).
Driveway permit onto a county road A driveway onto a maintained Travis County road needs a Travis County Driveway Permit, a driveway onto a state road needs a TxDOT permit, and the county issues no driveway permits on roads it does not maintain. Rural culverts have to be corrugated metal pipe of at least 18 inches (or a 15 by 21 inch oval) with concrete safety end treatments, commercial driveways run 12 to 25 feet wide, and a non-residential driveway permit is usually issued with the non-residential development permit. The FY2026 driveway permit fee is $165, rising to $190 on October 1, 2026. Utility work in the county right-of-way needs a separate utility installation permit with an engineer-sealed plan and a restoration bond of at least $5,000. Travis County Transportation and Natural Resources, Development Services, (512) 854-4215 From Travis County TNR Development Services, commercial driveway permit (read September 20, 2026).
Non-residential development checklist thresholds The county's Non-Residential Development Checklist, revised May 11, 2023, sets the triggers a commercial site meets: a stormwater pollution prevention plan at one acre or more of disturbance, possible permanent water quality controls above 10,000 square feet of new impervious cover, an environmental resource inventory above 10,000 square feet of disturbance, a 45 percent impervious cover limit unless the driveway is on a state road, a city signature or permit before a county permit issues in any city's extraterritorial jurisdiction, and a traffic impact analysis determination worksheet for a new county driveway. Travis County Transportation and Natural Resources, Development Services, (512) 854-4215 From Travis County TNR, non-residential development checklist (read September 20, 2026).

The permit office table puts the Travis development permit and Fire Marshal review in one row, next to what the other five counties' own sites list, desk, phone and read date included. The six counties side by side: permit offices by county.

When the lot is inside a city limit

CityCity's own listingCity deskRead at
Austin Inside Austin a building permit is required to erect, construct, enlarge, alter, repair, improve, remove, convert, move or demolish any building or structure within the city's zoning jurisdiction, and a commercial building goes through the Development Services Department's commercial plan review under the locally amended 2024 International Building Code, in force since July 10, 2025. A site plan, site plan correction or site plan exemption has to be in place before a commercial building permit application, and the two are reviewed together only with an approved concurrent review request. From July 15, 2026 the department's target review times are seven business days for new construction up to 10,000 square feet, 10 business days from 10,001 to 25,000 square feet and 20 business days above 25,000, with a minor revision at five days. Plans for work in a building or portion of a building over 5,000 square feet have to be sealed by a professional engineer under Building Criteria Manual 1.8.0, structural plans need a site-specific geotechnical report for new construction, and the application carries the TDLR registration confirmation. The FY 2025-26 commercial plan review fee schedule starts at $2,949.82 for up to 1,500 square feet and steps up by square footage, with a $176.76 application processing fee and a $250 fire review; permit fees are paid at issuance. On commercial property the exempt structures include a one-story tool or storage shed, playhouse or shade cloth structure of no more than 120 square feet outside a flood hazard area, a shade cloth structure for nursery or agricultural purposes without service systems and no size cap, fences up to seven feet, retaining walls up to four feet that support no surcharge, and water tanks up to 5,000 gallons. The city does not issue new construction permits in its extraterritorial jurisdiction and sends those applicants to the county. City of Austin Development Services, 6310 Wilhelmina Delco Drive, (512) 978-4000 From City of Austin Development Services, 6310 Wilhelmina Delco Drive (read September 20, 2026).
Pflugerville Pflugerville's building department takes every development application through its CityWorks permit portal and assesses the fees there once the application is complete. A new commercial building goes in with a digital plan set, the TAS acceptance for a valuation over $50,000, energy compliance checks and a special inspection certificate, and the plans go to the city, its third-party plan reviewer, fire and health as needed, at 15 to 20 business days per review. The permit card issues after a pre-construction meeting. The city builds to the 2021 International codes and the 2020 National Electrical Code, which its building page says apply in both the city and its ETJ. City of Pflugerville Building Inspections and Permits, (512) 990-6300 From City of Pflugerville Building Inspections and Permits (read October 22, 2026).
Bee Cave Bee Cave requires a permit in most cases, including new construction and structural changes, commercial and residential, additions, a change of occupant or tenant, demolition, retaining walls over four feet and septic installation. It follows the 2015 International Building, Mechanical, Plumbing and Fuel Gas Codes, the 2015 International Fire Code with amendments and the 2017 National Electrical Code, and takes applications through MyGovernmentOnline. Its page does not name accessory or metal buildings; the closest listed trigger is new construction and structural changes. City of Bee Cave Planning and Development, (512) 767-6675 From City of Bee Cave Planning and Development (read September 20, 2026).
West Lake Hills West Lake Hills adopted the 2021 International Code Council codes and the 2023 National Electrical Code on June 24. Commercial projects use its Commercial Building Permit Application, which the city says covers new construction, remodels and additions, landscaping, roofing, fences and impervious cover changes, submitted through MGOConnect, with first comments taking up to four weeks after the application is complete. The page does not address accessory or metal buildings. City of West Lake Hills Building and Development Services, (512) 327-3628 From City of West Lake Hills Building and Development Services (read September 20, 2026).

Other cities in this county, not read here, each with a permit desk of its own to confirm with: Lakeway, Manor, Lago Vista, Jonestown, Sunset Valley, Rollingwood.

Soil and rock in Travis County, with the source for each line

The 1974 soil survey places Travis County astride the Balcones Escarpment, which separates the limestone hills on the west from the Blackland Prairie on the east, with elevation running from 400 feet in the east to 1,400 feet in the west. Western soils formed over limestone, dolomite, interbedded limestone and marl, and clay; central soils over chalk, marl and limestone; eastern soils over clay, chalky marl and silty clay. From USDA Soil Conservation Service, Soil Survey of Travis County, Texas (1974), climate and parent material sections (read September 20, 2026).

East of the escarpment the survey groups the Blackland Prairie associations as mainly clays with high shrink-swell potential, highly corrosive to pipes and poorly suited to septic systems. The Houston Black-Heiden association is about 21 percent of the county; Houston Black soils are deep, moderately well drained clays that crack when dry and are very slowly permeable when wet, with a representative profile of clay to 104 inches. The survey says shrinking and swelling causes much damage to building foundations, roads and other structures. From USDA Soil Conservation Service, Soil Survey of Travis County, Texas (1974), general soil map and engineering uses of the soils (read September 20, 2026).

West of the escarpment the Brackett association, shallow gravelly calcareous loamy soils over interbedded limestone and marl, covers about 38 percent of the county, and Tarrant soils are shallow to very shallow stony clays, about eight inches over limestone, with rocks covering 25 to 85 percent of the surface. For the Tarrant association the survey names breaking and moving massive limestone for site leveling, street grading or septic systems as the main urban limitation. Western soils sit on the Glen Rose Formation, about 700 feet thick, and the Edwards Limestone, 250 to 300 feet thick. From USDA Soil Conservation Service, Soil Survey of Travis County, Texas (1974), general soil map, Brackett and Tarrant series, parent material (read September 20, 2026).

The Bureau of Economic Geology says the Balcones Escarpment in Austin generally parallels MoPac (Loop 1), that the fault zone runs from Dallas to Del Rio and extends two to five miles east of the escarpment, that soils east of it are deep and west of it thin and rocky, and that the rocks west of Austin are the Lower Cretaceous Glen Rose Formation and Edwards Group while the rocks east of the escarpment are the Upper Cretaceous Georgetown, Del Rio, Buda, Eagle Ford, Austin Chalk and Taylor Clay. From Bureau of Economic Geology, University of Texas at Austin, Geologic Wonders of Texas: Central Texas (read September 20, 2026).

Questions on permits and pricing, from the record

Outside Austin, what permit do metal building contractors in Travis County build under?

A county Development Permit, outside every city limit. Travis County requires one for buildings and other structures, and a commercial project that is not a dwelling files the Development (Non-Residential) permit with a construction cost estimate and a site plan sealed by a Texas-licensed engineer, through Transportation and Natural Resources at (512) 854-4215. A commercial establishment also needs a Fire Marshal building permit before construction. Inside Austin, Bee Cave, West Lake Hills or any other city, that city's own office permits the building instead.

Who permits a septic system for a shop or warehouse near Lake Travis?

For a lot inside 1,000 feet of Lake Travis, septic permits come from the Lower Colorado River Authority, while the building still needs its Travis County development permit. TCEQ's directory lists LCRA for the restricted and water quality zones of Lake Travis and for Jonestown, Lago Vista, Lakeway, Briarcliff and Volente, at (512) 578-3216. Elsewhere in unincorporated Travis County, Development Services is the TCEQ authorized agent, and a commercial system files the Non-Residential OSSF application with a soil evaluation and a plot plan.

What does Travis County charge for a non-residential development permit?

On the FY2026 schedule, effective January 1, 2026, $137 per application plus $1.99 per $1,000 of construction valuation outside the Austin extraterritorial jurisdiction, or $66 plus $1.99 per $1,000 inside it. On October 1, 2026 those rows rise to $158 plus $2.29 per $1,000, or $76 inside the ETJ, with a new $15 IT service fee per application. A commercial establishment's Fire Marshal permit is a separate fee, which the county schedule sets at $790 for construction value under $200,000.

Which part of Travis County is in the Edwards Aquifer contributing zone?

TCEQ's construction general permit defines it, for Travis County, as all land except the Colorado River watershed upstream of a point 1.3 miles above Tom Miller Dam: the land whose runoff drains downgradient into the recharge zone. Whether a particular parcel is inside it is decided only by TCEQ's official maps, kept in its offices; the online viewer is informational only. Confirm with the Austin Regional Office, (512) 339-2929, before pricing a Contributing Zone Plan.

Pricing request, six fields, no charge

Price a metal building in Travis County

Fill it in this order: county first, since it names the permit desk; then the building; then the start window, which sets what gets looked at first.

By submitting this form, I agree that Central Texas Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

Each request is routed to one independent contractor and is not sold to any lead list.

By phone instead: (737) 345-0282.

Last stop on the routing sheet: the price

Each request is routed to one independent contractor and is not sold to any lead list.

Sources re-read September 20, 2026.