Metal building contractors in Bastrop County, TX, and the development permit that comes first

Outside the cities in Bastrop County the office is Development Services at 211 Jackson Street, and what it issues is a development permit, not a building permit.

Building permits and certificates of occupancy are not issued by the county at all, and its building code stops at single-family homes and duplexes, with nothing for commercial use. That does not leave the lot unregulated.

Show the full introduction

The permit covers any external development outside the cities, the floodplain order sits on top of it, septic and the driveway are separate, and an emergency services district letter has to be in the file before the county issues.

Inside Bastrop

City building permit after site development plan approval

The City of Bastrop requires a commercial permit under the International Building Code for any non-residential or lodging structure or a residential structure with three or more dwellings, approved by the Building Official, and the city's Development Process page states that building permits are not issued before site development plan approval.

What the county's page says

The city has adopted the 2018 International Building Code family, the 2023 National Electrical Code and the 2018 International Fire Code with appendices.

From City of Bastrop Development Services, 1311 Chestnut Street (read September 20, 2026).

Bastrop County, outside city limits

County development permit for any external development; no building permit or CO

Bastrop County requires a development permit for any external development in the unincorporated area, issued by Development Services in three classes: Class A outside the floodplain, Conditional Class A, and Class B inside it.

What the county's page says

The county says it does not issue building permits or certificates of occupancy, that its building code applies only to single-family homes and duplexes, and that there is no county building code for any other use, including commercial.

From Bastrop County Development Services, and the Development Services application fees (read September 20, 2026).

Step one on this sheet: find the desk that has your lot. Everything below follows from it.

Which office permits a metal building outside the cities in Bastrop County?

Development Services, in three classes: Class A outside the floodplain, Conditional Class A, and Class B inside it. A commercial project files the Non-Single Family Application for Development Permit with a civil plan set stamped by a Texas-licensed professional engineer, a drainage report held to the county policy of zero net increase in runoff, and an emergency services district letter the county requires before it issues. The fee schedule adopted June 20, 2025 prices a commercial development permit at a $500 base plus $0.05 per building square foot plus $0.03 per square foot of impervious paving, capped at $25,000.

No county office reads the building for code. Local Government Code Chapter 233, read in full, gives a county no building code, permit or inspection authority over a commercial building, and Bastrop County lists no fire marshal and no fire code. Travis County and Caldwell County answer differently, as city or county permits around Austin shows.

  • An accessory building of 25 square feet or less, on no foundation and outside the floodplain, needs no permit.

From each county record, read 2026-09-20.

On a phone this table scrolls sideways.

CountyPermit past the city limitsSealed drawingsFire code at county level
BastropDevelopment permit, three classes by floodplain status; no building permit, no certificate of occupancyEngineer-stamped civil plan setNone listed
TravisDevelopment (Non-Residential) permit from Transportation and Natural ResourcesEngineer-sealed site planFire Marshal permit before construction
CaldwellCommercial Site Construction Permit before land clearingEngineer-certified drawingsYes, from August 13, 2026

The statute was read in full and grants no such authority. FromTexas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures (read September 20, 2026). FromBastrop County Development Services, and the Development Services application fees (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026). FromCaldwell County Development Ordinance, revised February 14, 2023, and the subdivision and development fee schedule (read September 20, 2026). FromCaldwell County Fire Code adopted August 13, 2026, and the order adopting it (read September 20, 2026).

Floodplain, septic and the driveway: who owns each one in Bastrop County?

Per the floodplain page, every development in the unincorporated county needs a development permit before a structure is built or placed, and the order revised July 14, 2025 makes a violation a misdemeanor fined up to $500 per violation. The named Floodplain Administrator is Marlene Flores, CFM, at (512) 581-7159.

Septic sits with the Environmental and Sanitation division; TCEQ lists the county as authorized agent across the whole county bar the City of Bastrop, which handles its own limits. Where no public wastewater is available the septic application goes in with the development permit; a standard commercial system is $1,000. A driveway onto a county road is $50, or $75 if built without a permit. County by county: septic, well and power hookups.

FromTexas Commission on Environmental Quality, getting a permit for an OSSF such as a septic system (read September 20, 2026). FromBastrop County Development Services, floodplain management (read September 20, 2026). FromBastrop County Development Services, environmental and sanitation, and the application fees (read September 20, 2026). FromBastrop County Development Services, application fees and residential driveway requirements (read September 20, 2026).

Where metal building contractors in Bastrop County file inside the city limits

With the city, on its own adopted codes. The City of Bastrop requires a commercial permit under the International Building Code for any non-residential structure and issues no building permit before site development plan approval. Inside Elgin city limits, building, enlarging, altering, repairing, moving or demolishing a building all take a city permit, and storage units are named on the list. Smithville names storage buildings and garages and allows up to ten workdays for plan review. The City of Bastrop Development Services, the Elgin Building Division and the City of Smithville were read 2026-09-20, and inside those limits a commercial-use metal building or a metal shop is filed with the city.

Lost Pines sand east, Axtell clay west: the ground under Bastrop County

The 1979 USDA Soil Survey of Bastrop County puts about 38,000 acres of the Lost Pines loblolly pine area here and makes the Patilo-Demona-Silstid association, sandy uplands, about 32 percent of the county; Patilo soils run roughly 52 inches of loose fine sand over sandy clay loam, with a perched water table at 48 to 72 inches after heavy rain. There the question is water under the slab.

West and north it puts Axtell-Tabor at about 29 percent, sandy loam over mottled clay, naming shrink-swell and corrosivity among its urban limitations. There the question is movement. Both answers are worked through on slab and anchor design.

FromUSDA Soil Conservation Service, Soil Survey of Bastrop County, Texas (1979), woodland, general soil map and the Patilo series (read September 20, 2026). FromUSDA Soil Conservation Service, Soil Survey of Bastrop County, Texas (1979), general soil map associations 2 to 4 and engineering uses of the soils (read September 20, 2026).

What does the state require, whoever issues the permit?

Three state rules hold across Bastrop County regardless. TDLR: below $50,000 of total estimated cost, no registration or plan review filing; at $50,000 and up, a complete construction document set. No local permit official may accept the application for a building at or over that line before the registration is verified.

TCEQ stormwater, by acres disturbed: five or more is a large construction activity, one up to five a small one. Engineer exemption, Occupations Code 1001.056: it ends past one story, 5,000 square feet or a 24-foot clear span. The sequence: the Austin-area metal building route.

FromTexas Department of Licensing and Regulation, Architectural Barriers frequently asked questions (read September 20, 2026). FromTexas Legislature Online, Government Code Chapter 469, elimination of architectural barriers (read September 20, 2026). FromTexas Commission on Environmental Quality, stormwater general permit for construction activities (TXR150000) (read September 20, 2026). FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026).

Who brings power to the lot, and who permits a driveway onto a state highway?

Bluebonnet Electric Cooperative runs a retail center in Bastrop, and starts new construction with a line design appointment at (800) 842-7708. Pedernales Electric Cooperative lists the counties it may serve in a tariff effective June 1, 2026, and Bastrop is not among them.

A new or modified access driveway on a state highway takes TxDOT Form 1058, and no work starts until the permit is executed, with 24 hours notice to TxDOT. The Austin District covers Bastrop County and keeps an area engineer office in Bastrop.

FromBluebonnet Electric Cooperative, line extensions, line design appointment, and the commercial developers package (revised June 4, 2024) (read September 20, 2026). FromPedernales Electric Cooperative, service for individual residential or commercial locations, and the tariff and business rules (read September 20, 2026). FromTexas Department of Transportation, Access Management Manual, chapter 2 section 4, permits, and the Use of Right of Way by Others Manual, access driveways (read September 20, 2026). FromTexas Department of Transportation, Austin District, and Austin District contacts and offices (read September 20, 2026).

County desks outside city limits, Bastrop County, TX

One row per county permit or rule that reaches a building past the city limits: what its own pages list, the desk and number to call, and the document and date it was read from.

Permit or county ruleCounty's own listingDesk to callRead at
Building permit outside city limits Bastrop County requires a development permit for any external development in the unincorporated area, issued by Development Services in three classes: Class A outside the floodplain, Conditional Class A, and Class B inside it. The county says it does not issue building permits or certificates of occupancy, that its building code applies only to single-family homes and duplexes, and that there is no county building code for any other use, including commercial. A commercial or other non-single-family development files the Non-Single Family Application for Development Permit with a civil construction plan set stamped by a Texas-licensed professional engineer, a drainage report meeting the county's zero net increase in runoff policy, and a letter from the applicable emergency services district, which is required for issuance. The fee schedule adopted June 20, 2025 sets a commercial development permit at a $500 base plus $0.05 per building square foot plus $0.03 per square foot of impervious paving, capped at $25,000; an accessory building of 25 square feet or less on no foundation and outside the floodplain needs no permit, and the same fee schedule prices larger accessory buildings at $50 under 200 square feet, $100 from 200 to 1,000 and $500 above. A development permit expires if construction is not complete three years after issuance. The county lists no fire marshal, no fire code and no fire code permit; its ordinances page carries no fire code or building code order. Bastrop County Development Services, 211 Jackson Street, Bastrop, (512) 581-7176 From Bastrop County Development Services, and the Development Services application fees (read September 20, 2026).
Floodplain development permit Per the county's floodplain page, every development in unincorporated Bastrop County needs a development permit, applied for before a structure is built or placed, and the Flood Damage Prevention Order revised July 14, 2025 requires the development permit for the unincorporated area, with violations a misdemeanor fined up to $500 per violation and each day a separate offense. The page names Marlene Flores, CFM, Floodplain Manager, as the county Floodplain Administrator, who reviews, approves or denies development permits, at (512) 581-7159, with a Floodplain Technician at (512) 581-4098. Bastrop County Development Services, Floodplain Administrator, (512) 581-7159 From Bastrop County Development Services, floodplain management (read September 20, 2026).
On-site sewage facility (septic) permit Septic permits are issued by the Environmental and Sanitation division of Development Services at 211 Jackson Street; TCEQ's directory names Bastrop County as authorized agent countywide, with one carve-out: the City of Bastrop handles its own city limits. Where no public wastewater is available the development permit and the septic application are submitted together, and the application form lists accessory building, single-unit commercial and multi-unit commercial as development classifications. Fees: a standard commercial system $1,000, a non-standard commercial design by an engineer or designer $1,200, a standard residential system $600, design resubmission $250 and re-inspection $200. Bastrop County Development Services, Environmental and Sanitation, 211 Jackson Street, (512) 581-4042 From Bastrop County Development Services, environmental and sanitation, and the application fees (read September 20, 2026).
Driveway permit onto a county road Driveway permits are handled by Development Services with a $50 fee, or $75 if the driveway is built without a permit; the Temporary Driveway Application form states a permit is valid 180 days from issuance, and a one-time 180-day extension of a driveway or development permit may be granted if requested 30 days before expiration. The residential driveway standards set a throat width of 12 to 24 feet, an all-weather surface, and a culvert of corrugated metal or reinforced concrete pipe with a 15-inch minimum diameter. No separate road and bridge driveway office is named. Bastrop County Development Services, (512) 581-7176 From Bastrop County Development Services, application fees and residential driveway requirements (read September 20, 2026).
Zoning and signs Bastrop County has no general zoning in the unincorporated area, only airport zoning near Austin Executive Airport, and does not regulate signs on private property; zoning exists inside the cities of Bastrop, Elgin and Smithville. Bastrop County Development Services, (512) 581-7176 From Bastrop County Development Services, frequently asked questions (read September 20, 2026).

Bastrop County keeps all four permits at 211 Jackson Street; the other five counties split those jobs differently. The six counties side by side: permit offices by county.

When the lot is inside a city limit

CityCity's own listingCity deskRead at
Bastrop The City of Bastrop requires a commercial permit under the International Building Code for any non-residential or lodging structure or a residential structure with three or more dwellings, approved by the Building Official, and the city's Development Process page states that building permits are not issued before site development plan approval. The city has adopted the 2018 International Building Code family, the 2023 National Electrical Code and the 2018 International Fire Code with appendices. City of Bastrop Development Services, 1311 Chestnut Street, (512) 332-8840 From City of Bastrop Development Services, 1311 Chestnut Street (read September 20, 2026).
Elgin Elgin's Building Division requires a permit for any owner or agent who constructs, enlarges, alters, repairs, moves, demolishes or changes the occupancy of a building or structure inside the city limits, and its list of permit-required work names storage units. Its adopted codes are the 2021 International family (the 2021 International Building Code and Fire Code with appendices among them) and the 2020 National Electrical Code; permits go through My Government Online. City of Elgin Building Division, (512) 281-0119 From City of Elgin Building Division (read September 20, 2026).
Smithville Smithville's permitting guide lists storage buildings, external garages, carports, decks and new homes as needing a building permit, says commercial and industrial construction follows a similar process and may need additional consultation, and gives the Building Official up to ten workdays for plan review. The fee schedule effective March 9, 2026 charges a commercial plan review fee of one-half percent of total construction, a $50 certificate of occupancy and a penalty of three times the fee for work without a permit. No page read states which code edition the city has adopted. City of Smithville, City Hall, 317 Main Street, (512) 237-3282 From City of Smithville, City Hall, 317 Main Street (read September 20, 2026).

Soil and rock in Bastrop County, with the source for each line

The 1979 soil survey says about 38,000 acres of the Lost Pines loblolly pine area is in Bastrop County, about 100 miles west of the East Texas pine belt. The Patilo-Demona-Silstid association, sandy surface layers on uplands, is about 32 percent of the county, and the survey names the sandy surface layer, permeability and a high water table as its urban limitations; Patilo soils are about 52 inches of loose fine sand over sandy clay loam with a perched water table at 48 to 72 inches after heavy rain. From USDA Soil Conservation Service, Soil Survey of Bastrop County, Texas (1979), woodland, general soil map and the Patilo series (read September 20, 2026).

The Axtell-Tabor association is about 29 percent of the county, deep loamy soils with a thin fine sandy loam surface over mottled clay and very slow permeability, with shrink-swell potential, corrosivity and permeability named as urban limitations; the Crockett-Wilson association, about 18 percent, and the Behring-Crockett-Heiden association, about 11 percent, carry the same three limitations. The survey says group A-7 clay soils have low strength when wet and are the poorest subgrade. From USDA Soil Conservation Service, Soil Survey of Bastrop County, Texas (1979), general soil map associations 2 to 4 and engineering uses of the soils (read September 20, 2026).

The Wilcox Group crops out across the western county in a belt nine to 15 miles wide and is the most important water-bearing unit, supplying all water for Bastrop and Elgin; the Patilo, Silstid and Demona soils formed in the Carrizo, Queen City and Sparta sands in the eastern county, and Heiden and Houston Black dominate the Kemp Clay outcrop. From USDA Soil Conservation Service, Soil Survey of Bastrop County, Texas (1979), parent material (read September 20, 2026).

Questions on permits and pricing, from the record

What does Bastrop County issue instead of a building permit, and who signs it?

A development permit, which Development Services issues in three classes for any external development in the unincorporated area. Building permits and certificates of occupancy are not issued by the county, and its building code covers single-family homes and duplexes and nothing else. On a commercial development the plan set is stamped by a Texas-licensed professional engineer. Inside the cities the city permits it.

Where do metal building contractors in Bastrop County get the septic permit?

From the Environmental and Sanitation division of Bastrop County Development Services at 211 Jackson Street. TCEQ names the county as authorized agent for all of it except the City of Bastrop. The septic application goes in with the development permit where no public wastewater is available, and a standard commercial system is $1,000.

What does a Bastrop County development permit cost for a commercial building?

Under the fee schedule adopted June 20, 2025 it is a $500 base plus $0.05 per building square foot plus $0.03 per square foot of impervious paving, capped at $25,000. A driveway permit is $50, or $75 if built without one.

Does the $50,000 accessibility review apply outside city limits?

Yes. It is a state program, so a city limit changes nothing. Per TDLR, a project below $50,000 of total estimated cost files no registration or plan review, though the Texas Accessibility Standards still govern it; at $50,000 and up it submits a complete set of construction documents.

Pricing request, six fields, no charge

Price a metal building in Bastrop County

Fill it in this order: county first, since it names the permit desk; then the building; then the start window, which sets what gets looked at first.

By submitting this form, I agree that Central Texas Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

Each request is routed to one independent contractor and is not sold to any lead list.

By phone instead: (737) 345-0282.

Last stop on the routing sheet: the price

Each request is routed to one independent contractor and is not sold to any lead list.

Sources re-read September 20, 2026.