A Texas professional engineer seals the foundation whenever the permit desk wants sealed sheets, and the statutory exemption is a narrow one. Under Occupations Code 1001.056, plans skip an engineer's license for a single-story building within 5,000 square feet whose clear spans stay at 24 feet or less across the short side, on condition that the public is offered no engineering services; inside that size, any unsupported span past 24 feet still requires that its roof-supporting members be engineered or pre-engineered. Also outside the requirement: a private dwelling with its garage, and a private farm, ranch or agricultural building. Section 1001.056(c) takes the exemption back for a residential slab on expansive soil unless the work meets the International Residential Code as the jurisdiction applies it. The architecture chapter has a parallel rule about who draws the sheets: under Occupations Code 1051.606, someone not presenting themselves as an architect may prepare plans for a privately owned commercial building within the limit of two stories or 20,000 square feet.
The offices set their own bar. Inside Austin, the commercial checklist says plans for a building over 5,000 square feet are sealed by a professional engineer, and structural plans for new construction list a site-specific geotechnical report. In unincorporated Travis County the non-residential development permit carries a site plan sealed by a Texas-licensed engineer, the Fire Marshal's plans go in stamped by a Texas licensed engineer, and the county pages read describe no structural plan review by the development office. Bastrop County's non-single-family development permit takes a civil plan set stamped by a Texas-licensed professional engineer; Caldwell County's commercial site construction permit needs engineer-certified drawings. Unincorporated Williamson County lists no building permit, building code or plan review for a commercial or accessory structure, so no county office reads the foundation sheet; the Fire Marshal's review there is a non-structural architectural plan review.
FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026).
FromTexas Legislature Online, Occupations Code Chapter 1051, architects (read September 20, 2026).
FromCity of Austin Development Services, commercial building plan review and inspection permit fees (FY 2025-26) and the commercial building application checklist (read September 20, 2026).
FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026).
FromTravis County Fire Marshal, permits and plan reviews, and Travis County Code Chapter 201 (read September 20, 2026).
FromBastrop County Development Services, and the Development Services application fees (read September 20, 2026).
FromCaldwell County Development Ordinance, revised February 14, 2023, and the subdivision and development fee schedule (read September 20, 2026).
The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026).
FromWilliamson County Fire Marshal, construction permits, and the Williamson County Fire Code, second edition (read September 20, 2026).